Sunday 18 January 2015

Objectives

Objectives (WEEK 3 - STUDY PROJECT OBJECTIVE)

The objectives of this project are:

i.                    To develop an automatic re-closed Earth Leakage Circuit Breaker for fault in three phase system.

ii.                  To develop an automatic tripping mechanism for three phase system


iii.                To analysis voltage during the normal condition, second condition (main trip) and third condition (backup trip) of the automatic earth leakage circuit breaker in order to determine the proposed system performance.

No comments:

Post a Comment