Objectives (WEEK 3 - STUDY PROJECT OBJECTIVE)
The
objectives of this project are:
i.
To develop an automatic re-closed Earth
Leakage Circuit Breaker for fault in three phase system.
ii.
To develop an automatic tripping
mechanism for three phase system
iii.
To analysis voltage during the normal
condition, second condition (main trip) and third condition (backup trip) of
the automatic earth leakage circuit breaker in order to determine the proposed
system performance.
No comments:
Post a Comment