CONCLUSION (week 8 - finish research and prepare for presentation)
This project is designed in the form of hardware for three single
phase transformers 230v to 12V of output for to develop an automatic tripping mechanism for the three phase supply system while
temporary fault and permanent fault occurs. Here we used 555 timer with relay
for the fault is temporary or permanent and the hardware will be done in final
year project 2 next semester.
From this project, the upgraded circuit breaker instruments from
old Earth Leakage Circuit Breaker (ELCB) has created and make it safer to human
and protect them from electrical danger. The Automatic Earth
Leakage Circuit Breaker (Auto-ELCB) is also can be
used in factory with some modifying to make it suitable for the factory needed.
Auto-ELCB is the solution for the temporary trip and the temporary trip
is the most factor for the trip in Malaysia. Lighting is the common factor. So
when the circuit breaker automatic turn on after the temporary fault, the power
will continue supply into the house and the owner do not have to worry about
their house. Alarm system also can continue active to guide the house and
prevent from the thief while owner is not at home.
No comments:
Post a Comment